The Challenge
Resources were strained by the COVID-19 pandemic, and the church’s most urgent need shifted to providing additional space for their children’s ministry.
The Solution
In response, SSA quickly adapted by designing a freestanding children’s ministry facility. The building was detached from the main structure to bypass local code requirements that would have triggered a costly and time-consuming full sprinkler system upgrade to the existing building. This creative detachment allowed the project to move forward more efficiently, saving both time and money while avoiding design delays.
The Results
The new children’s facility not only complements the existing building aesthetically but also provides the much-needed space for the growing ministry. The project’s efficiency in design and execution enabled Reveal Fellowship to meet its immediate needs, ensuring that their children’s programs could thrive without disrupting their ongoing activities.